On 24 July 2012 Saint-Petersburg Foundation for Investment Projects and ZAO "Geningconsult" signed the Contract for Engineering Consultancy Services in the Traveler's Palace - Main Building restoration project.
Dam protects St. Petersburg against floods
The complexof dam structures, which was built around St. Petersburg with the participation of ZAO "Geningconsult",preventeddamageto St. Petersburgfrom possiblefloodingon November 28, 2011amounting toUSD 42 mln.
Construction of the first phase of the Gas-Turbine Power Station (steam-gas unit) «Molzhaninovka» of 220-240 MW total electric capacity and more then 340 Gcal/hour heat capacity.
Procurement of technology and equipment for oil deeper conversion complex for OAO “Rosneft-Tuapsinsky NPZ” to increase productivity and quality of light-oil products.
Construction of preliminary water removal plant, intended for separation of oil filled water from produced oil and pumping of dewatered oil to the pipeline to reduce in-pipe corrosion risk during the oil pumping process.
Development of project design, construction, delivery and installation of a fixed drilling rig by 400 t capacity for drilling directional wells. Development of heat supply systems to drilling rigs allowing to use the equipment under low temperature (up to – 45C°) and comfortable conditions for the personnel.
Introduction of safety equipment into the coal output process; training of miners and administrative personnel in safety issues; identifying main trends in technical modernization of militarized mining-rescue units (MMRU).
Introduction of safety equipment into coal output process; training of miners and administrative personnel in safety issues; identifying main trends in technical modernization of militarized mining-rescue units (MMRU).
Introduction of safety equipment into coal output process; training of miners and administrative personnel in occupational safety issues; identifying main trends in technical modernization of militarized mining-rescue units (MMRU).
Procurement of the equipment for workovers of shut-off and failure wells, procurement of the specialized oil equipment, the engineering services for cementing, perforation, logging and hydraulic fracturing. Upgrading of the oil production techniques by use of the nitrogen technology and installation of coil tubing.
Procurement of the equipment for workovers of shut-off and failure wells, modernization of the oil-well pumps and electrical submersible pumps, replacement of 600 km of oil pipelines and flowlines pipes, procurement of the engineering services for logging, perforation, cementing and hydraulic fracturing
Modernization of the recovery methods, including replacement of the out-of-date equipment, modernization of the road-building machines stock, including high-capacity trains, trucks and trailers. Replacement of 500 km of the pipeline and flowlines pipes in the oilfields. Procurement of stop valves for the pipelines. Procurement of mobile flaw detector laboratories for the pipeline systems inspection. Procurement of pipeline cleaning and insulation equipment, including pipe connecting and welding equipment. Procurement of rotor excavators and pipelayers. Procurement of complex ecological laboratories and laboratories for pipeline corrosion monitoring.
Procurement of consulting services:
Implementing bidding procedures for selection of consulting companies for re-development of the Sovetskoye oilfield, ecological monitoring, well servicing, drilling of directional wells, cutting windows in the emergency and low-producing wells, introduction of the nitrogen technologies.
Modernization of the recovery methods, including replacement of the out-of-date equipment. Procurement of stop valves for the pipelines. Procurement of measuring units, casing and drilling pipes, tubing. Procurement of pumping equipment for oil recovery, stationary upper-driven drilling rigs, drilling bits, chemicals and corrosion inhibitors for the pipeline systems, high-capacity shelled cranes, saddle trucks and trailers.
Procurement of consulting services:
Implementing bidding procedures for selection of consulting companies for oilfield re-development, ecological monitoring, well servicing, workover and drilling of the directional and horizontal wells. Procurement of technical services for logging, perforation, cementing, acid treatment and hydrofracturing operations.
Restructuring of the RF coal entities, closing the non-effective mines, implementation of the Program for supporting the miner populated towns, providing social protection for the workers discharged from the industry employment, improvement of the state subsidy system for the coal industry.
Reconstruction of theAstrakhan GRESwith the construction ofPGU-110"turn key"with a maximumelectrical output(net)of at least 110MWand a maximumthermalcapacity of notless than 182Gcal /hour.