On 24 July 2012 Saint-Petersburg Foundation for Investment Projects and ZAO "Geningconsult" signed the Contract for Engineering Consultancy Services in the Traveler's Palace - Main Building restoration project.
Dam protects St. Petersburg against floods
The complexof dam structures, which was built around St. Petersburg with the participation of ZAO "Geningconsult",preventeddamageto St. Petersburgfrom possiblefloodingon November 28, 2011amounting toUSD 42 mln.
Provision of services of an Engineer for Contract FC-11(w) “Reconstruction and restoration of the Eastern Wing of the former General Staff Building (State Hermitage)
The goal of providing services of the Engineer (ZAO “Geningconsult”) is, among others, to provide for construction Contract management and supervision of the works under the Contract in compliance with responsibilities provided to the Engineer in accordance with the Contract concluded on the basis of the standard FIDIC Format, firth addition, 1987, rev. 1992 with additional corrections
Rehabilitation of residential buildings, replacement and repairing of underground engineering systems under the pilot sub-projects «Kvartal 130», «Dvory Kapelly», «Nevsky Prospect».
Reconstruction of existing and construction of new administrative buildings in Sofiyskaya Embankment (ownership 26-30) and in Bolotnaya street (ownership 18) of the Moscow Central Administrative District ("Faleevsky-Bolotnaya" block).
Designing and construction of the OAO NK "Rosneft" HealthCenter, hotel for 25-30 rooms. Reconstruction of the bathing building with closed swimming pool and the beach line of the central clinical sanatorium named after F. E. Dzerzhinsky.
Designing and construction of the recreation center by 1500 sq. m. area for the personnel of the Rosneft–Sakhalinmorneftegaz drilling and oil exploration department:
Reconstruction of the private residence in the center of Moscow for the hotel complex of 55 rooms. Complete replacement of overhead covers and engineering systems by preserving the historical facade.
Audit of structures. Development of design for comfortable hotel rooms and modern premises, general reconstruction works, replacement of the engineering systems, final finishing of the interiors, construction of the attic floor. Improvement of the adjacent territories.
Construction of the central commodity base for oil and gas field equipment and accessories for OAO NK "Rosneft" and its branches including transport support and customs offices. Establishment of computer database for products.
Construction of 3 residential buildings- 28-storey towers made of monolithic concrete in the city area of Buenos Aires, improvement of the adjacent territories. Sales and lease of living space.
Reconstruction of residential complex in the central prestige area of Buenos Aires in Montevideo street. Complete replacement of floors and engineering systems and preservation of the original façade of the 19th century . Sales and lease of residential apartments.
The turnkey hotel construction. Reconstruction of the existing building, construction of additional buildings. Finishing of the facades and interiors. The hotel complex includes:
Reconstruction of office for the Economic Analysis Bureau(EAB), situated in the Higher Economy School building at the address of Maly Gnezdnikovsky Per., 4.
Reconstruction of 472 sq. m. premises of the Sidanco Moscow office , including architectural and space-planning decisions, construction and finishing works, delivery and installation of equipment.
Office Reconstruction for the Center of Preparation and Implementation of International Technical Assistance Projects at Srednaya Pereslavskaya Street. Reconstruction of the building ground floor with replacing of all engineering systems.
The turnkey construction of the gasoline complex. Installation of bearing structures of the filling complex, delivery and installation of filling, washing and tool equipment.